Establish the real location rows
Use the actual vehicle location or operating branch, not an assumed installation destination. Record the local contact and the person responsible for confirming the unit list. Keep sensitive contact details in the private procurement record. If a vehicle moves between branches, explain which location applies to the proposed project. Separate a geographic preference from a confirmed service arrangement so suppliers can respond to the actual logistics question.
- Give each branch a stable location ID used throughout the RFP.
- Keep locations awaiting confirmation clearly marked.
Add vehicle and scope groups
Within each location, group vehicles by verified body configuration and requested coverage. Connect the group to a count and list individual unit exceptions where needed. Identify old graphics, condition questions and artwork variations. Do not treat one fleet total as evidence that every unit uses the same layout or preparation. The matrix should help suppliers identify which work they can evaluate and what additional information they require before making a commitment.
- Link current overview photographs to each distinct body group.
- Record whether counts are confirmed, provisional or expected additions.
Use the matrix as the response structure
Ask bidders to respond to the same location and vehicle IDs. Keep assumptions, exclusions and unpriced items attached to the relevant row. If a supplier proposes a different arrangement, request a clear explanation rather than silently replacing your baseline. Update the matrix through revisions when locations or counts change, and notify the same participating bidders of material changes. This gives the business a comparable record without claiming that the request itself reserves work.
- Keep a revision date and change summary on each issued matrix.
- Separate proposed installation arrangements from confirmed assignments.
Keep a working record
Before you approve the next step
- Actual locations identified.
- Local vehicle contacts assigned.
- Configuration and coverage groups listed.
- Counts show confirmation status.
- Exceptions and evidence linked.
- Bidders asked to use the same row references.
Use the free planning tool to organize the details you can confirm and the questions still open.
Four questions before the next step
Does an RFP establish nationwide installation availability?
No. It describes the requested work. Each supplier needs to confirm the locations, responsibilities and capacity it can actually offer, and the business needs to evaluate those responses.
Read the detailed guide: Build a location-by-vehicle fleet RFP matrix
Can provisional vehicles be included?
Yes, if they are clearly separated from confirmed counts. Explain the uncertainty and ask how a later quantity change would be handled in the proposal.
Read the detailed guide: Build a location-by-vehicle fleet RFP matrix
Should one supplier own every stage?
That is a procurement choice. Whichever arrangement is proposed, document the actual responsibilities and handoffs so the business can assess whether it meets the project requirements.
Read the detailed guide: Map responsibility across a distributed wrap project
Can a branch approve a local change?
Only within the authority the business has given it. Define that authority before rollout, and connect approved local exceptions to the central artwork and scope records.
Read the detailed guide: Map responsibility across a distributed wrap project
Original technical sources
Use the linked publisher's current instructions for the exact product and vehicle. This planning guide does not replace its application, safety or warranty requirements.
